VerdictPENDING, OVERDUE (by about ten months)
PromiserGreater Orlando Aviation Authority (GOAA)
PlaceOrlando, Florida (Orlando International Airport: Terminals A and B, and restrooms at all four airsides)
Promised2025-12-31 ("Construction is scheduled to begin in 2025 with substantial completion in 2027", GOAA release, Jan. 13, 2025)
Delivered / statusNot started in the records read: GOAA's pages now give construction starts of Winter 2026 (restrooms), 2027 (Airsides 1 and 3) and 2028 (landside levels), with substantial completion in 2029-2030; program cost $351 million
Last checked2026-11-04

Verdict: PENDING, OVERDUE, by about ten months. In January 2025 the Greater Orlando Aviation Authority (GOAA) said, in a release on Orlando International Airport's website, that it "is moving forward with plans to refurbish the interiors in Terminals A & B and upgrade restrooms at all four airsides", and that "Construction is scheduled to begin in 2025 with substantial completion in 2027." [C1, C1b, C1d] Reading "begin in 2025" as by the end of 2025, the start is 10 months and 4 days late at this entry's last check [C1b]. In GOAA's construction report for October 2026, "Restroom design and logistics planning are in progress" and "subcontractor trade procurement is in progress", and on Airsides 1 and 3 "The contractor has completed and submitted 30% design documents." [C28, C29] The third piece, the landside Levels 2 and 3 of Terminals A and B, is "included in the future program" [C26]. GOAA's own pages now give substantial completion in 2029 and 2030 [C16, C16b, C17].

Last checked: November 4, 2026.

Corrected 20 October 2026: two lines, on the restroom change orders and on the restroom award vote, were extended with a second GOAA record that had been saved as a scan without a text layer: the minutes of the Construction Finance Oversight Committee's meeting of March 24, 2026. The verdict and every date in the timeline are unchanged.

Re-checked November 4, 2026. GOAA's construction report for the October 2026 Board, posted after the last check, says of the restrooms: "Restroom design and logistics planning are in progress. The 100% design documents are in progress, and subcontractor trade procurement is in progress. The project is on schedule." [C28] The restroom contract is unchanged at "Current Contract $71,970,777.00" and 1344 days, with completion "01/30/29", and the report shows "Paid To Date Thru PA # 14 $4,261,791.84" [C28b, C28c]. Of Airsides 1 and 3 it says "The contractor has completed and submitted 30% design documents." [C29] GOAA's project pages, read again on November 4, give the same starts and completions as on October 13 [C31, C31b]. The Construction Committee's change-order agenda for November 3, 2026 lists a change order of $152,497.00 on the Airsides 1 and 3 contract, for replacing the public address system at Airside 1, and two restroom change orders of $0.00, each with zero days of time impact [C30, C30b]. That is an agenda; this entry read no result. The records read still show no construction started on any of the three pieces. The verdict is unchanged; the delay is counted to this check.

The promise

GOAA's release "GOAA Celebrates 2024 Awards, Looks Ahead to 2025 Projects", dated January 13, 2025, under the heading "TERMINAL A & B RENOVATIONS" [C1d]:

"The Aviation Authority is moving forward with plans to refurbish the interiors in Terminals A & B and upgrade restrooms at all four airsides. The scope will consist of the design and construction of Landside and Airside interior refurbishment, and will include new flooring, new wall finishes, new ceilings with lighting improvements, and new restrooms. Construction is scheduled to begin in 2025 with substantial completion in 2027." [C1, C1b, C1c]

Timeline

What changed, and why, in the record's own words

What it cost

What is still open

What this entry did not check

Sources

  1. C1 https://flymco.com/media/press-releases/item/goaa-celebrates-2024-awards-looks-ahead-to-2025-projects/
  2. C1b https://flymco.com/media/press-releases/item/goaa-celebrates-2024-awards-looks-ahead-to-2025-projects/
  3. C1c https://flymco.com/media/press-releases/item/goaa-celebrates-2024-awards-looks-ahead-to-2025-projects/
  4. C1d https://flymco.com/media/press-releases/item/goaa-celebrates-2024-awards-looks-ahead-to-2025-projects/
  5. C2 https://netapps.ocfl.net/Mod/meetings/7/1884
  6. C2b https://netapps.ocfl.net/Mod/meetings/7/1899
  7. C3 https://flymco.com/media/press-releases/item/goaa-board-welcomes-lance-lyttle-new-airport-ceo/
  8. C3b https://flymco.com/media/press-releases/item/goaa-board-welcomes-lance-lyttle-new-airport-ceo/
  9. C3c https://flymco.com/media/press-releases/item/goaa-board-welcomes-lance-lyttle-new-airport-ceo/
  10. C3d https://flymco.com/media/press-releases/item/goaa-board-welcomes-lance-lyttle-new-airport-ceo/
  11. C3e https://flymco.com/media/press-releases/item/goaa-board-welcomes-lance-lyttle-new-airport-ceo/
  12. C4 https://downloads.ctfassets.net/qiecpoxp4bka/6ostesKS43SSEpA2kfo5mQ/fd6ebee8dc84b8fd44494426bc16f189/20260318_-__Agenda_Board_Packet_-_Final_v3.pdf
  13. C4b https://downloads.ctfassets.net/qiecpoxp4bka/6ostesKS43SSEpA2kfo5mQ/fd6ebee8dc84b8fd44494426bc16f189/20260318_-__Agenda_Board_Packet_-_Final_v3.pdf
  14. C4c https://downloads.ctfassets.net/qiecpoxp4bka/6ostesKS43SSEpA2kfo5mQ/fd6ebee8dc84b8fd44494426bc16f189/20260318_-__Agenda_Board_Packet_-_Final_v3.pdf
  15. C4d https://downloads.ctfassets.net/qiecpoxp4bka/6ostesKS43SSEpA2kfo5mQ/fd6ebee8dc84b8fd44494426bc16f189/20260318_-__Agenda_Board_Packet_-_Final_v3.pdf
  16. C5 https://assets.ctfassets.net/qiecpoxp4bka/2vm31gvfNz9GN1EOSlX7We/e5d2c6f0af469c93ef8f26ea55dcb572/Revised_Board_Agenda_Packet_2025-10-15.v3.pdf
  17. C6 https://assets.ctfassets.net/qiecpoxp4bka/25nQ4tuveIatvaWy3jFkL3/1a660520d27ccb3700528137e50ebcad/Revised_Agenda_Packet_20251119_-_v2-1.pdf
  18. C7 https://assets.ctfassets.net/qiecpoxp4bka/6fKKUbsaDWzMDZRfMKLcil/cdcf8fc6464f1a71f361cbf1ec1fe53c/Board_Agenda_Packet_2026-01-21_-_Final.pdf
  19. C8 https://assets.ctfassets.net/qiecpoxp4bka/7pV5nBgMfKMLyrWfgME0X0/b42acda292e2e6625eed0b6e722fad74/Revised_Board_Agenda_Packet_-_20260520_-_Final.pdf
  20. C9 https://assets.ctfassets.net/qiecpoxp4bka/74wmDWOOnIScdZ8b9tijat/288b9a2c67b4288580fc71aad40843c7/Board_Meeting_Packet_20260415_-_Revised_v3.pdf
  21. C9b https://assets.ctfassets.net/qiecpoxp4bka/74wmDWOOnIScdZ8b9tijat/288b9a2c67b4288580fc71aad40843c7/Board_Meeting_Packet_20260415_-_Revised_v3.pdf
  22. C10 https://downloads.ctfassets.net/qiecpoxp4bka/5rEZrfpmCPd96VuopPyxtT/916644d54112edbe96cdd7b238e5be9e/REVISED_Board_Agenda_Packet_20260916_v3.pdf
  23. C10b https://downloads.ctfassets.net/qiecpoxp4bka/5rEZrfpmCPd96VuopPyxtT/916644d54112edbe96cdd7b238e5be9e/REVISED_Board_Agenda_Packet_20260916_v3.pdf
  24. C10d https://downloads.ctfassets.net/qiecpoxp4bka/5rEZrfpmCPd96VuopPyxtT/916644d54112edbe96cdd7b238e5be9e/REVISED_Board_Agenda_Packet_20260916_v3.pdf
  25. C11 https://assets.ctfassets.net/qiecpoxp4bka/3R9oV8oRitLXtErcul0ISP/9832b73200c8c4c42fddf613189291f7/Committee_Meeting_Packet_20260916.pdf
  26. C11b https://assets.ctfassets.net/qiecpoxp4bka/3R9oV8oRitLXtErcul0ISP/9832b73200c8c4c42fddf613189291f7/Committee_Meeting_Packet_20260916.pdf
  27. C12 https://downloads.ctfassets.net/qiecpoxp4bka/2I115xGysHMG5zByMHRq6i/2f581fed4976d62c14c13fcec91e288b/Board_Agenda_Packet_20260218_-_Final_-_REVISED_v3.pdf
  28. C12b https://downloads.ctfassets.net/qiecpoxp4bka/2I115xGysHMG5zByMHRq6i/2f581fed4976d62c14c13fcec91e288b/Board_Agenda_Packet_20260218_-_Final_-_REVISED_v3.pdf
  29. C12c https://downloads.ctfassets.net/qiecpoxp4bka/2I115xGysHMG5zByMHRq6i/2f581fed4976d62c14c13fcec91e288b/Board_Agenda_Packet_20260218_-_Final_-_REVISED_v3.pdf
  30. C12d https://downloads.ctfassets.net/qiecpoxp4bka/2I115xGysHMG5zByMHRq6i/2f581fed4976d62c14c13fcec91e288b/Board_Agenda_Packet_20260218_-_Final_-_REVISED_v3.pdf
  31. C12e https://downloads.ctfassets.net/qiecpoxp4bka/2I115xGysHMG5zByMHRq6i/2f581fed4976d62c14c13fcec91e288b/Board_Agenda_Packet_20260218_-_Final_-_REVISED_v3.pdf
  32. C13 https://downloads.ctfassets.net/qiecpoxp4bka/6ostesKS43SSEpA2kfo5mQ/fd6ebee8dc84b8fd44494426bc16f189/20260318_-__Agenda_Board_Packet_-_Final_v3.pdf
  33. C13b https://downloads.ctfassets.net/qiecpoxp4bka/6ostesKS43SSEpA2kfo5mQ/fd6ebee8dc84b8fd44494426bc16f189/20260318_-__Agenda_Board_Packet_-_Final_v3.pdf
  34. C14 https://downloads.ctfassets.net/qiecpoxp4bka/5rEZrfpmCPd96VuopPyxtT/916644d54112edbe96cdd7b238e5be9e/REVISED_Board_Agenda_Packet_20260916_v3.pdf
  35. C14b https://downloads.ctfassets.net/qiecpoxp4bka/5rEZrfpmCPd96VuopPyxtT/916644d54112edbe96cdd7b238e5be9e/REVISED_Board_Agenda_Packet_20260916_v3.pdf
  36. C15 https://downloads.ctfassets.net/qiecpoxp4bka/7Ch9k7ksG9TykEoZEyILo3/96cbeb7444e8a48fcbccce9c93e0711e/Agenda_Packet_12-17-2025_-_Revised_v4.pdf
  37. C16 https://flymco.com/elevatingmco/current-projects/current-north-terminal-renovations/
  38. C16b https://flymco.com/elevatingmco/current-projects/current-north-terminal-renovations/
  39. C16c https://flymco.com/elevatingmco/current-projects/current-north-terminal-renovations/
  40. C17 https://flymco.com/elevatingmco/future-projects/north-terminal-renovations/
  41. C17b https://flymco.com/elevatingmco/future-projects/north-terminal-renovations/
  42. C18 https://flymco.com/media/press-releases/item/goaa-board-approves-new-investments-to-elevate-mco/
  43. C18b https://flymco.com/media/press-releases/item/goaa-board-approves-new-investments-to-elevate-mco/
  44. C20 https://downloads.ctfassets.net/qiecpoxp4bka/5rEZrfpmCPd96VuopPyxtT/916644d54112edbe96cdd7b238e5be9e/REVISED_Board_Agenda_Packet_20260916_v3.pdf
  45. C21 https://netapps.ocfl.net/Mod/meetings/7/1936
  46. C21b https://netapps.ocfl.net/Mod/meetings/7/1936
  47. C22 https://assets.ctfassets.net/qiecpoxp4bka/25nQ4tuveIatvaWy3jFkL3/1a660520d27ccb3700528137e50ebcad/Revised_Agenda_Packet_20251119_-_v2-1.pdf
  48. C22b https://assets.ctfassets.net/qiecpoxp4bka/25nQ4tuveIatvaWy3jFkL3/1a660520d27ccb3700528137e50ebcad/Revised_Agenda_Packet_20251119_-_v2-1.pdf
  49. C22c https://assets.ctfassets.net/qiecpoxp4bka/25nQ4tuveIatvaWy3jFkL3/1a660520d27ccb3700528137e50ebcad/Revised_Agenda_Packet_20251119_-_v2-1.pdf
  50. C23 https://downloads.ctfassets.net/qiecpoxp4bka/5rEZrfpmCPd96VuopPyxtT/916644d54112edbe96cdd7b238e5be9e/REVISED_Board_Agenda_Packet_20260916_v3.pdf
  51. C24 https://downloads.ctfassets.net/qiecpoxp4bka/7Ch9k7ksG9TykEoZEyILo3/96cbeb7444e8a48fcbccce9c93e0711e/Agenda_Packet_12-17-2025_-_Revised_v4.pdf
  52. C24b https://downloads.ctfassets.net/qiecpoxp4bka/7Ch9k7ksG9TykEoZEyILo3/96cbeb7444e8a48fcbccce9c93e0711e/Agenda_Packet_12-17-2025_-_Revised_v4.pdf
  53. C25 https://downloads.ctfassets.net/qiecpoxp4bka/5rEZrfpmCPd96VuopPyxtT/916644d54112edbe96cdd7b238e5be9e/REVISED_Board_Agenda_Packet_20260916_v3.pdf
  54. C26 https://flymco.com/elevatingmco/current-projects/current-north-terminal-renovations/
  55. C26b https://flymco.com/elevatingmco/future-projects/north-terminal-renovations/
  56. C27 https://assets.ctfassets.net/qiecpoxp4bka/3vaI4qkvm32dc33pw7nZWv/01ade343f2eebbcacb784c541f1691cd/Committee_Meeting_Minutes_Packet_-_20260520.pdf#page=22
  57. C27b https://assets.ctfassets.net/qiecpoxp4bka/3vaI4qkvm32dc33pw7nZWv/01ade343f2eebbcacb784c541f1691cd/Committee_Meeting_Minutes_Packet_-_20260520.pdf#page=22
  58. C28 https://downloads.ctfassets.net/qiecpoxp4bka/6Q38hmWBSJ6o4HreoiJSLK/42d84c8b8e0897660c0912da23911def/20261021_Board_Agenda_Packet_-_Final_-_Second_Revised.pdf#page=325
  59. C28b https://downloads.ctfassets.net/qiecpoxp4bka/6Q38hmWBSJ6o4HreoiJSLK/42d84c8b8e0897660c0912da23911def/20261021_Board_Agenda_Packet_-_Final_-_Second_Revised.pdf#page=325
  60. C28c https://downloads.ctfassets.net/qiecpoxp4bka/6Q38hmWBSJ6o4HreoiJSLK/42d84c8b8e0897660c0912da23911def/20261021_Board_Agenda_Packet_-_Final_-_Second_Revised.pdf#page=325
  61. C29 https://downloads.ctfassets.net/qiecpoxp4bka/6Q38hmWBSJ6o4HreoiJSLK/42d84c8b8e0897660c0912da23911def/20261021_Board_Agenda_Packet_-_Final_-_Second_Revised.pdf#page=322
  62. C30 https://downloads.ctfassets.net/qiecpoxp4bka/NXGauTKmFqkkMmV6Pu6yo/3c3f9988df208ae47433604302d4b449/Construction-Agenda-R1-20261103.pdf#page=4
  63. C30b https://downloads.ctfassets.net/qiecpoxp4bka/NXGauTKmFqkkMmV6Pu6yo/3c3f9988df208ae47433604302d4b449/Construction-Agenda-R1-20261103.pdf#page=4
  64. C31 https://flymco.com/elevatingmco/current-projects/current-north-terminal-renovations/
  65. C31b https://flymco.com/elevatingmco/future-projects/north-terminal-renovations/